Power Sector Inside Out (Part-5)

Energy Mix and Generation Cost Electricity tariff for end consumer depends on many factors and divided into many categories for example, domestic users, commercial, industrial, peak time and off peak time rates etc. Moreover tariff also varies according to units of electricity consumed by a [...]

2017-09-15T10:51:12+05:00Blog, Inside Out|Comments Off on Power Sector Inside Out (Part-5)

Power Sector Inside Out (Part-4)

Top Tens In this section statistics are provided for projects which made their place in top and bottom tens. Major categories which were used to prepare these lists include Capacity, Generation and Capacity Factor. In every category 10 projects are selected which topped in their [...]

2017-09-15T10:51:12+05:00Blog, Inside Out|Comments Off on Power Sector Inside Out (Part-4)

Power Sector Inside Out (Part-3)

Performance Evaluation of Power Sector The claim that Pakistan has 24,375 MW installed capacity is true for books, magazines and newspapers, however the capacity lone cannot be used as an indicator to measure the efficiency of power system. The average net capacity factor of all [...]

2017-09-15T10:51:12+05:00Blog, Inside Out|Comments Off on Power Sector Inside Out (Part-3)

Power Sector Inside Out (Part-2)

Installed Capacity and Generation Electricity in Pakistan is generated by 89 different power plants, owned by Public and Private Sector. Out of these 87 projects, 32 are owned and operated by government of Pakistan (Public Sector Projects), 3 projects are owned by Pakistan Atomic Energy [...]

2017-09-15T10:51:12+05:00Blog, Inside Out|Comments Off on Power Sector Inside Out (Part-2)