Overview of Dasu Hydropower Project

Tags: , , , , , , , , , , , , , , , , , , , |

Introduction: Dasu Hydropower Project has a cumulative generation capacity of 4,320 MW. The dam is being constructed by WAPDA on River Indus, upstream of Dasu Town in District Kohistan of Khyber Pakhtunkhwa (KP) Province. Proposed [...]

August 2015

Power Sector Inside Out (Part-5)

Tags: , , , , , , , , , , , , , , , , , |

Energy Mix and Generation Cost Electricity tariff for end consumer depends on many factors and divided into many categories for example, domestic users, commercial, industrial, peak time and off peak time rates etc. Moreover tariff [...]

Power Sector Inside Out (Part-4)

Tags: , , , , , , , , , , , , , , , , , |

Top Tens In this section statistics are provided for projects which made their place in top and bottom tens. Major categories which were used to prepare these lists include Capacity, Generation and Capacity Factor. In [...]

Power Sector Inside Out (Part-3)

Tags: , , , , , , , , , , , , , , , , , |

Performance Evaluation of Power Sector The claim that Pakistan has 24,375 MW installed capacity is true for books, magazines and newspapers, however the capacity lone cannot be used as an indicator to measure the efficiency [...]

Power Sector Inside Out (Part-2)

Tags: , , , , , , , , , , , , , , , , , |

Installed Capacity and Generation Electricity in Pakistan is generated by 89 different power plants, owned by Public and Private Sector. Out of these 87 projects, 32 are owned and operated by government of Pakistan (Public [...]

Power Sector Inside Out (Part-1)

Tags: , , , , , , , , , , , , , , , |

Year 2013-14 was another addition to more than decade old power crises in Pakistan. Despite the maximum demand only being 81% of the total installed capacity of the country, domestic, commercial and industrial consumers are [...]