Khyber Pakhtunkhwa Economic Zones Development and Management Company (KPEZDMC) invited the proposals from Independent Power Producers (IPP) for the development of two gas based Combined Cycle thermal power project, each with an on-site capacity of 225 MW. Standard Pre-Qualification Documents (PQD) were issued to all interested participants. A detailed scoring criterion for technical and financial [...]
GILGIT-BALTISTAN ENERGY ROADMAP DOCUMENT
asim2017-12-09T10:31:06+05:00The assignment is targeted to obtain Technical Assistance Support from Asian Development Bank, for the development of Hydropower Potential of Gilgit-Baltistan. The document highlighted The current structure of legal and organizational framework. Existing potential of hydropower generation. Proposed amendments in existing legal and constitutional framework. Required organizational restructuring and capacity building measures. Project costing and [...]
188 MW Naran Dam Hydropower Project
asim2017-12-09T10:48:14+05:00Worked on this project for two different clients. This project was first advertised as Semi-Raw Site and our scope of work was as follows in first round of services. Preparation of project viability analysis report based on primary data available. Preparation and submission of project proposal Preparation of tariff model of the Project. Preparation of [...]
640 MW Azad Patan Hydropower Project
asim2017-12-09T10:47:45+05:00Preparation of project viability analysis report based on pre-feasibility study; projected tariff and financial model of Project. Assistance in preparation of SOQ's to obtain the WI from PPIB. Preparation of RFP and ranking report for selection of consultant for feasibility study. Preparation and maintenance of project accounts & assistance in due diligence of project by [...]