Preparation of project viability analysis report based on pre. Feasibility study; projected tariff and financial model of Project. Assistance in preparation of SOQ's to obtain the 1.01 from PPIB. Preparation of RFP and ranking report for selection of consultant for feasibility study. Supervision of feasibility study conducted by Scott Wilson and assisted in approval of [...]
720 MW Karot Hydropower Project
asim2017-12-09T10:03:10+05:00Preparation of project viability analysis report based on pre-feasibility study; projected tariff and financial model of Project. Assistance in preparation of SOQ's to obtain the LOI from PPIB. Assistance in preparation of RFP and ranking report for selection of consultant for feasibility study. Preparation of tariff model and a detailed financial model of Project based [...]
84 MW New Bong Escape Hydropower Project
asim2015-07-01T16:28:47+05:00Preparation of Tariff Model & Tariff Proposals. Preparation and negotiations of PPA, IA and WUA with NTDC and PPIB. Preparation and presentation of detailed financial model of the project. Preparation of Hydrology Model & Energy calculations. Preparation of Startups & Shutdowns model. Preparation of PDD for developing the project as CDM activity. Obtained the validation [...]